Mabry & Ledesma

Built on Houston clay.

See our work

Book a site visit

Commercial build-outs, custom homes, renovations and flood rebuilds across greater Houston — priced line by line and run by one superintendent from slab to keys.

Mabry & Ledesma

Book a site visit

Tell us about the job and we'll call within one business day to set up a free site walk — usually within a week. Your fixed-price estimate follows ten business days after that. Rather talk now? Call or text (713) 555-0186.

Request a site visit

Slabs that stay flat roofs that stay on floors that stay dry

Houston builds on shifting clay, under hurricane wind and below a lot of water. We've spent twenty years building for all three.

Post-tensioned slabs on every new foundation, sealed and strapped roof decks as standard, and every finished floor set above the line the city asks for — then some. Licensed, bonded and insured.

See the projects

// Selected projects

Work that's still standing.

A few of the 640-plus jobs we've built since 2006 — commercial finish-outs, ground-up homes and houses raised above the next flood.

//

01

Pediatric clinic, Yale Street

The Heights — clinic finish-out, 2025

//

02

Raised house on the bay

Seabrook — lifted nine feet, 2024

//

03

Café & roastery, Canal Street

East End — build-out, 2025

Mabry & Ledesma

General contractors for commercial and residential work across greater Houston, since 2006.

See every project

Recent projects

A few of the jobs we've finished in the last three years. Ask and we'll put you in touch with the owners — most are happy to talk.

Pediatric clinic finish-out

The Heights

2025

Raised house on the bay

Seabrook

2024

Café & roastery build-out

East End

2025

Two-story addition

West University

2024

Dental office finish-out

Memorial

2023

Custom home

Garden Oaks

2025

Kitchen & primary suite

Bellaire

2025

Taqueria build-out

Spring Branch

2024

Book a site visit

// What we build

From a finish-out to a whole house

01 / 04

Commercial

Commercial build-outs

/S01

Commercial build-outs

Clinics, restaurants, offices and storefronts, 1,500 to 30,000 square feet. We deal with the landlord, the city and every trade, and hand you the keys on the date in the contract.

From $95/sq ft

Ask for an estimate

02 / 04

Residential

Custom homes

/S02

Custom homes

Ground-up on your lot, with your architect or one we work with. A post-tensioned slab, a sealed and strapped roof deck, and the finished floor set above the city's flood line.

From $310/sq ft

Ask for an estimate

03 / 04

Renovation

Renovations & additions

/S03

Renovations & additions

Kitchens, primary suites, second stories and whole-house renovations. A line-by-line price before we open a wall, and a written report with photos every Friday.

Kitchens from $48,000

Ask for an estimate

04 / 04

Flood

Flood rebuilds & elevation

/S04

Flood rebuilds & elevation

Since Harvey we've raised more than ninety Houston homes. We handle the engineering, the permits and your move-out plan — and the assessment is free.

Elevation from $110,000

Ask for an estimate

// Field notes before you build

What we tell every client first.

Building on Houston clay

Why every slab we pour is post-tensioned, and why your foundation wants a drink in August.

Read the note

What “raised” means after Harvey

How high, how long and what it costs to lift a house above the next flood.

Read the note

Reading a fixed-price estimate

Allowances, change orders and the lines most bids leave out.

Read the note

// Field note

Building on Houston clay

Most of Houston sits on expansive clay. It swells when it's wet and shrinks when it's dry, and a slab that isn't built for it cracks, sticks doors and pulls tile apart within a few summers. Every new slab we pour is post-tensioned: steel cables run through the concrete and are pulled tight once it cures, so the slab moves as one piece instead of cracking where the ground moves. We set the forms on compacted fill, slope the grade away from the house and make sure the gutters send the water somewhere it can leave. After that, the clay wants a steady drink. In a dry August, a soaker hose a couple of feet from the foundation, an hour or two a few times a week, keeps the soil from pulling away. Every homeowner gets a one-page sheet on it at the walkthrough.

Book a site visit

// Field note

What “raised” means after Harvey

Since 2018 the city has asked new and substantially rebuilt homes in the floodplain to sit higher than they used to. How high depends on your lot: we start with the survey and the flood map, then the engineer sets the height — for the homes we raise, usually somewhere between three and eight feet. A slab-on-grade house is lifted in one piece. We dig under the slab, slide steel beams through, raise it on hydraulic jacks a few inches at a time, then build new piers and a stair. Most jobs take twelve to sixteen weeks, and you'll be out of the house for most of it — we help you plan the move. Raising starts at $110,000. Grants and flood-insurance mitigation money can cover part of it; we'll walk you through the paperwork, but we never promise what a program will pay.

Book a site visit

// Field note

Reading a fixed-price estimate

A fixed price is only fixed if everything is on the page. Ours lists every line — demolition, framing, each trade, permits, cleanup and our fee — so you can lay two estimates side by side and compare them honestly. Allowances are the lines for things you haven't picked yet: tile, fixtures, appliances, lighting. We write a realistic number for each, so choosing the tile you actually want isn't a surprise. Spend less and the difference comes back to you. A change order is a change you ask for after we start. Each one is priced in writing before we do the work, and you sign it first. The three lines most bids leave out: permits, dumpsters and the final clean. Ours has all three.

Book a site visit

2006—26

Twenty years of keys handed over.

Jo Mabry trained as a structural engineer and ran commercial jobs downtown for nine years. Luis Ledesma framed his first house in Pasadena at nineteen. In 2006 they started building together out of a rented garage in the East End. Today we're 38 people — our own carpenters, concrete and finish crews — and the two of them still walk every job.

640+

Projects since 2006

4.9

Rating from 212 reviews

90+

Homes raised since Harvey

“They raised our house seven feet and we never once had to chase anybody for an answer. A report and photos every Friday.”

Denise, Meyerland

“Our clinic opened on the date in the contract. Not a week later.”

Priya, The Heights

“Luis caught a drainage problem before the inspector did. That's who you want building your house.”

Marcus, Garden Oaks